Improvements will be made in the following areas
LIGHTING SYSTEMS
- 107 Buildings
- 96,330 T8 lamps
- 42,100 Electronic Ballasts
- 5,700 Compact Fluorescents
- 162 LED Exit Lights
- Light Levels Meet or Exceed IES Standards
- Standardized Fixtures
- Recycling of Mercury-Containing Lamps and PCB Ballasts
- 45% Lighting Energy Reduction
GO BACK TO LIST
WATER SYSTEMS
- 100 Buildings
- 3,241 Low Flow Toilets and Flush Valves
- 687 Low Flow Flush Valves on Urinals
- 3,846 Aerators
- 282 Pedal Valves
- 1,589 Low Flow Showerheads
- 4 Water Wells
- Improved Appearance of Plumbing Fixtures
- Reduced Maintenance Needs
- 44% Water Reduction
GO BACK TO LIST
STEAM SYSTEMS
- Steam Traps
- 1,419 Steam Traps Replaced with Orifice
Device
- Improved Safety and Comfort
- Reduce Repairs and Extend Equipment Life
- Steam Leak Repairs
- 14 Buildings
- Replace
Faulty Valves
- Improved Efficiency
- Eliminate
Safety Hazard
- Steam Vault Upgrades
- 107 Steam Vaults
- Replace
Piping, Insulation, and Valves
- Significant Safety and
Control Improvements
GO BACK TO LIST
STEAM CONDENSATE SYSTEMS
- Condensate Piping
- Replace 2,674 Feet of Underground
Piping
- Insulate New Piping
- Save Water, Energy
and Treatment Chemicals
- Significant Safety Measure for
Staff and Students
- Condensate Pumps
- Replace 26 Condensate Pumps and 7
Condensate Receivers
- Improved Efficiency of Steam
System
- Energy, Water and Chemical Treatment Savings
GO BACK TO LIST
ENERGY PLANTS
- South, East and West Energy Plants
- Replace Four
Chillers, Two Cooling Towers, and Associated Pumps
-
Install Variable Speed Drives
- Decreased Maintenance
Costs
- Replace Aged Equipment
- North Energy Plant
- New 4,800-ton Central Energy Plant
-
Two Chillers, Cooling Towers, Pumps, and Piping
- Primary
Service to Four Buildings
- Supplement East and West
Energy Plants
GO BACK TO LIST
SUPPLY SIDE NATURAL GAS
- Negotiate Better Natural Gas Price
- Purchase Gas through Hedging Techniques
- Budget Management through Market Purchasing
- Locks Fuel Prices for Fixed Quantities
GO BACK TO LIST
CENTRAL CONTROL AND MONITORING
- 47 Buildings
- Variable Speed Drives on AHUs, and Chilled Water, Hot Water and Condenser Water
- Pumps
- Upgrade Pneumatic Controls to DDC
- Calibrate Existing Pneumatic Thermostats
- Implement Control Strategies
- Optimize Chilled Water Plant Operation
- Increased Occupant Comfort
GO BACK TO LIST
ON-SITE ENERGY TEAM
- Dedicated Team
- Maximize Energy Savings
- Identify Additional Savings Opportunities
- Support Environmental Advisory Committee
- Provide Staff Training
- LEED Building Consulting
- Student Conservation Initiatives
GO BACK TO LIST
MISCELLANEOUS PROJECTS
- Non-Chemical Water Treatment
- Open-Loop Cooling System
(Five Facilities)
- Eliminate Hazardous Chemicals and
Corrosion
- Decreased Maintenance and Repair
-
Improved Efficiency
- Swimming Pool Covers
- Thermal Covers for Four Pools
-
Custom Shaped and Fastened to Deck
- Reduced Water Loss
-
Safety Improvement
- High-Efficiency Transformers
- Replace 97 Transformers
in 13 Buildings
- Improve Total Harmonic Distortion
-
Increase Useful Life of Computers, Monitors, Printers, etc.
- Vending Miser
- Install Power Controls on 242 Cold
Beverage Machines
- 40% Reduced Energy Consumption
-
Reduced Maintenance Costs
|